We use cookies on our website to provide you with the best experience. Most of these are essential and already present.
We do require your explicit consent to save your cart and browsing history between visits. Read about cookies we use here.
Your cart and preferences will not be saved if you leave the site.

1000Füssler

Abraum
a new subway tunnel is being built in the harbor area of hamburg's inner city. the tunneling produces waste and the waste needs to be disposed of. in this case sand and shredded rubble are mixed with groundwater in order to be pumped out through steel tubes with a diameter of approximately 80cm. the sounds that are produced in the tubes are object of field recordings that i made at different times and places on site. it was immediately apparent that the continuum of the basic sounds that i used …
1